Polyester fleece also suitable for use under asphalt coverings on Elastodrain® EL 202.
non-rotting, heavy-duty / extremely high load bearing Filter Sheet made of polyester (PES), Thickness 1.0-1.4 mm, strength class 3, penetration force min. 1500 N, maximum tensile strength: min. 400 N/5cm, tensile expansion elongation at longitudinal / across: approx. 35 / 50 %, melting point >200°C,
| Order Nr.: | 2220 |
|---|---|
| Colour: | white |
| Length [m]: | 100,0 |
| Material: | Polyester |
| Width [m]: | 2,0 |
| Thickness [mm]: | 1,0-1,4 |
| Packaging unit: | Role |
| Weight [g/m²]: | 200,0 |
| CBR test / penetration force [N]: | min. 1500 |
| Geotextile strength class / strength factor: | 3 |
| Tensile expansion / elongation at rupture or at break [%]: | 35/50 |
| Melting point [°C]: | > 200 |
| Compatible with bitumen: | yes |
| Non-rotting: | yes |
| UV-stabilized / protected against UV light: | no |
| Additional information: | Maximum tensile strength: at least 400 N/5 cm |
non-rotting, extremely high load bearing strength Filter Sheet made of polyester (PES), Weight approx. 200 g/m², Thickness 1.0-1.4 mm, Strength class 3, Penetration force min. 1500 N, Maximum tensile strength min. 400 N/5cm, Tensile expansion / elongation longitudinal / across approx.35/50%, Melting point >200°C.
Can be used under asphalt pavements (manual installation and static compaction) onElastodrain® "EL 202"
Product: Zinco Separation Sheet heat-resistant "TVH 200"
Unit: m²
Order Nr.: 2220
Installation should not be carried out if there is a risk of storms.
Laying under asphalt pavements:
The heat resistant Membrane is preferably used under asphalt pavements in semi-rigid construction or under mastic asphalt. It is laid loosely with approx. 200 mm overlapping on the already waterproofing / sealing roof. The Membrane can also be raised slightly at rising edges of roof / perimeter and structural elements. Elastodrain® EL 202 slabs are laid on top (see Elastodrain® EL 202 Installation Instructions). A second layer of TVH 200 Separation Sheet heat-resistant fleece is laid on top. The asphalt base layer and the asphalt surface layer are laid directly on top of this. It should be noted that the asphalt base layer is laid by hand with static compaction.
When laying mastic asphalt as a trafficable / can be driven over layer, the bottom layer should not be thicker than 60-80 mm and should be left for 0.5-1.0 hours before laying the next layer(s).
To protect against UV radiation and blowing away, cover the Membrane immediately after laying.
Cutting:
The Membrane can be cut using a cutter knife (with a hard blade) or sturdy universal scissors. When cutting, make sure that the already laid layers are not damaged under any circumstances! If damage does occur, it must be reported and repaired immediately.