Zinco Wicking Mat DV 40, roll approx. 2 x 25 m, Weight approx. 600 g/m²
Water-dispersing Membrane with capillary-effective fibers on one-sided for use in conjunction with the "Sponge-City-Roof" system build-up.
Water-distributing polyester capillary-effective fabric (length approx. 40 mm) on one side, e.g. for use in conjunction with the "Sponge-City-Roof" system build-up for temporary retention. Roll approx. 50 m², gross roll width 2.10 m, including approx. 10 cm one-sided fibre-free edge for overlapping.
| Order Nr.: | 2160 |
|---|---|
| Colour: | Fibers: grey, Membrane: white |
| Length [m]: | 25,0 |
| Material: | Polyester |
| Width [m]: | 2 * |
| Packaging unit: | Role |
| Weight [g/m²]: | 600,0 |
| Non-rotting: | Yes |
| UV-stabilized / protected against UV light: | no |
| Additional info: | * Gross roll width 2.10 m, including approx. 10 cm one-sided fibre-free edge for overlapping; fibre length: approx. 40 mm |
membrane made of polyester with capillary-effective fibres on one side, Weight approx. 600 g/m², fibre length approx. 40 mm, fibre-free edge approx. 10 cm on one side, absorbency and quantity tailored to the requirements of simple intensive Green Roofs, supply and lay with 10 cm overlap on fully laid drainage or retention elements
the fully laid drainage or retention elements.
Make: Zinco Wicking Mat "DV 40".
Unit: m²
Order Nr.: 2160
Wicking Mat DV 40 is laid loosely on drainage elements with at least 10 cm overlapping, including at head joints. The Wicking Mat DV 40 must be rolled out so that the fibers of the Membrane protrude into the chambers of the drainage element. The overlapping must take place at the one-sided fibre-free edge of the wicking fleece. The Membrane is not raised at the edges of roof / perimeter and rising structural elements. To ensure that the entire surface is supplied with water without loss, the Membrane must be prevented from sagging or overhanging. A gravel strip must therefore be provided at the edge of roof / perimeter and around penetrations. The Wicking Mat DV 40 must be temporarily secured against blowing away after installation. It must be covered immediately after installation to protect it against UV radiation.
Cutting:
The Membrane must be cut with suitable fiber scissors. Over roof outlets, the Wicking Mat DV 40 must be cut to at least the size of the outlet; a cross cut is not sufficient