Zinco Connectors for FD 25 and FD 40, pack of 100 pieces
Connectors for Floradrain® elements, FD 25 and FD 40, made of yellow plastic.
Order Nr.:
9620
Product information "Zinco Connectors for FD 25 and FD 40, pack of 100 pieces"
made of yellow plastic.
| Order Nr.: | 9620 |
|---|---|
| Colour: | Yellow |
| Material: | plastic |
| Weight [g]: | 200,0 |
| Additional info: | Pack of 100 pieces; 2 clamps per running meter |
Connecting the Floradrain®elements laid butt-jointed
from position '.........' by pressing connecting
connectors into the openings for diffusion. Requirement: approximately / approx. 2 clamps/m².
Product: ZinCo "Connectors for FD 25/40"
Unit: m²
Order Nr.: 9620
These Installation Instructions describe the essential steps for using this product. Please also observe the relevant standards and guidelines, in particular the occupational health and safety regulations.
Installation should not be carried out if there is a risk of storms.
Installation:
The Floradrain elements are laid loose butt-jointed or with one or two rows of studs overlapping. Elements laid butt-jointed can be connected with Connectors. These are pressed into the openings for diffusion (perforations in the studs). Requirement: 2 Connectors/m².
The elements are laid under Green Roofs with the openings for diffusion facing upwards. When used under walkways, the openings for diffusion are directed downwards so that no water is stored.
The drainage elements must be covered immediately after installation (UV protection!) and secured against blowing away. The latter can be done for a short time by backfilling with water if the actual Superimposed / extra load does not follow immediately.
Cutting:
The drainage elements can be cut with a cutter knife (with a hard blade) or a hot wire. When cutting, make sure that the already laid layers are not damaged under any circumstances! If damage does occur, it must be reported and repaired immediately.
Above roof outlets, the drainage elements must be cut to the size of the opening of the Inspection Chamber to be installed above.
Installation should not be carried out if there is a risk of storms.
Installation:
The Floradrain elements are laid loose butt-jointed or with one or two rows of studs overlapping. Elements laid butt-jointed can be connected with Connectors. These are pressed into the openings for diffusion (perforations in the studs). Requirement: 2 Connectors/m².
The elements are laid under Green Roofs with the openings for diffusion facing upwards. When used under walkways, the openings for diffusion are directed downwards so that no water is stored.
The drainage elements must be covered immediately after installation (UV protection!) and secured against blowing away. The latter can be done for a short time by backfilling with water if the actual Superimposed / extra load does not follow immediately.
Cutting:
The drainage elements can be cut with a cutter knife (with a hard blade) or a hot wire. When cutting, make sure that the already laid layers are not damaged under any circumstances! If damage does occur, it must be reported and repaired immediately.
Above roof outlets, the drainage elements must be cut to the size of the opening of the Inspection Chamber to be installed above.