Zinco EL 202 Connector 2-holes for EL 202 Pack of 100 pieces
eL 202 Connector 2-holes for Elastodrain EL 202 made of rubber.
Order Nr.:
3221
Product information "Zinco EL 202 Connector 2-holes for EL 202 Pack of 100 pieces"
made of rubber
| Order Nr.: | 3221 |
|---|---|
| Colour: | black |
| Material: | fully vulcanized rubber |
| Weight [kg]: | approx. 2.0 kg/pack |
| Additional information: | Pack of 100 pieces; 2 connectors per running meter |
for connecting 2 studs of theElastodrain® EL 202protection and drainage mat, requirement 2 pieces per running meter of joint length (approx. 4 pieces per square meter), supply and install according to manufacturer's specifications.
Make: ZinCoElastodrain® EL 202 Connector 2-holes
Unit: m²
Order Nr.: 3221
These Installation Instructions describe the essential steps for using this product. Please also observe the relevant standards and guidelines, in particular the occupational health and safety regulations.
Installation should not be carried out if there is a risk of storms.
Installation:
Elastodrain® slabs must always be laid with the studs facing upwards. The slabs must be aligned in such a way that the seam protruding at the top can always be placed on the seam protruding at the bottom of the adjacent slab. If the Elastodrain® slabs are to be driven over, e.g. to apply the System Substrate / Substrate Soil / Growing Medium, it is advisable to secure them against slipping beforehand with two fasteners per joint
To protect against UV radiation, cover the drainage slabs with a Filter Sheet after laying.
A vibrating plate can be used to compact the gravel, but it must be taken into account that the work is being carried out on a roof surface. Select the vibratory plate accordingly so that the vibrations of the floor slab are not too great.
Foundations/back supports are constructed on the Filter Sheet.
Cutting:
The drainage slabs can be cut with an electric cutter. When cutting, make sure that the already laid layers are not damaged under any circumstances! If damage does occur, it must be reported and repaired immediately.
Over roof outlets, the drainage boards must be cut according to the size of the outlet.
Installation should not be carried out if there is a risk of storms.
Installation:
Elastodrain® slabs must always be laid with the studs facing upwards. The slabs must be aligned in such a way that the seam protruding at the top can always be placed on the seam protruding at the bottom of the adjacent slab. If the Elastodrain® slabs are to be driven over, e.g. to apply the System Substrate / Substrate Soil / Growing Medium, it is advisable to secure them against slipping beforehand with two fasteners per joint
To protect against UV radiation, cover the drainage slabs with a Filter Sheet after laying.
A vibrating plate can be used to compact the gravel, but it must be taken into account that the work is being carried out on a roof surface. Select the vibratory plate accordingly so that the vibrations of the floor slab are not too great.
Foundations/back supports are constructed on the Filter Sheet.
Cutting:
The drainage slabs can be cut with an electric cutter. When cutting, make sure that the already laid layers are not damaged under any circumstances! If damage does occur, it must be reported and repaired immediately.
Over roof outlets, the drainage boards must be cut according to the size of the outlet.