Zinco fixing material for vertical mounting of PV modules, pack of 50 pcs.
Mounting material for the SGS 90 Solar base frame set.
Order Nr.:
9744
Product information "Zinco fixing material for vertical mounting of PV modules, pack of 50 pcs."
50 hammer-head bolts M8x20 and 50 flange nut / locking nut M8, Stainless steel material
| Order Nr.: | 9744 |
|---|---|
| Material: | Stainless steel |
| Packaging unit: | Pack of 50 pieces |
| Additional information: | 50 hammer-head bolts M8x20; 50 flange nuts / locking nuts M8 |
These Installation Instructions describe the essential steps for using this product. Please also observe the relevant standards and directives, in particular the occupational health and safety regulations.
Scope of delivery per unit:
1 Zinco Solar Base SB 200
1 Solar base frame set SGS 90
2 coupling profiles
4 module connectors
4 Corner joints
2 center connectors
1 pack of fastening material
Tools required:
Socket wrench SW 15
Socket wrench SW 13
Cut-off grinder
Assembly steps:
Place the Solar base frame set SGS 90 on the pre-assembled fastening points of the Solar Base SB 200.
Hand-tighten SGS 90 with the nuts incl. washer, tightening torque ≥ 20 Nm.

Lay out SB 200 with mounted SGS 90 according to Zinco planning.

Horizontal coupling profiles with Corner joint...

... or center connector and fastening material with SGS 90, cut the coupling profiles to length according to module size

The horizontal coupling profiles connected to the SGS 90.

Inserting the bifacial module, mounting using 4 module connectors and fastening material on the horizontal coupling profiles.

Fully assembled module unit with 2 SGS 90.
Notice:
- The material temperature should not be below +5 ° when carrying out the installation.
- The SB 200 is placed on a protective layer and must always be completely filled and covered with bulk material.
- Provide Superimposed / extra load according to structural engineering / structures.
- No liability if the installation instructions are not followed.
Scope of delivery per unit:
1 Zinco Solar Base SB 200
1 Solar base frame set SGS 90
2 coupling profiles
4 module connectors
4 Corner joints
2 center connectors
1 pack of fastening material
Tools required:
Socket wrench SW 15
Socket wrench SW 13
Cut-off grinder
Assembly steps:
Place the Solar base frame set SGS 90 on the pre-assembled fastening points of the Solar Base SB 200.
Hand-tighten SGS 90 with the nuts incl. washer, tightening torque ≥ 20 Nm.

Lay out SB 200 with mounted SGS 90 according to Zinco planning.

Horizontal coupling profiles with Corner joint...

... or center connector and fastening material with SGS 90, cut the coupling profiles to length according to module size

The horizontal coupling profiles connected to the SGS 90.

Inserting the bifacial module, mounting using 4 module connectors and fastening material on the horizontal coupling profiles.

Fully assembled module unit with 2 SGS 90.
Notice:
- The material temperature should not be below +5 ° when carrying out the installation.
- The SB 200 is placed on a protective layer and must always be completely filled and covered with bulk material.
- Provide Superimposed / extra load according to structural engineering / structures.
- No liability if the installation instructions are not followed.