Zinco Guardrail Base GB, approx. 1.0 x 2.0 m, height approx. 43 mm
Superimposed / extra load supported construction base for penetration-free railing solutions such as the ZinCo Railing System or on-site railings (also available with additional fastening option on request for Fallnet® SB 200-Rail) on flat roofs or roof terraces. Superimposed / extra load can be provided by concrete slabs in a chippings bedding or bulk materials (gravel, greening substrates, etc.).
Construction base for non-penetrative railing solutions made of profiled ABS plastic with integrated aluminium profiles on the underside and a post support on the face side with steel screw flange, hot-dip galvanized in accordance with DASt guideline 022, to accommodate 4 M 10 screws at 100 x 75 mm spacing, height of ABS-plastic with integrated aluminium profiles on the underside approx. 35 mm, backfill volume up to top of base plate approx. 16 l/sqm, dimensioned in accordance with DIN EN 1991-1-1/NA for horizontal forces up to 1 kN/m, total height approx. 78 mm.
| Order Nr.: | 3420 |
|---|---|
| Colour: | black |
| Length [m]: | 2,0 |
| Material: | Base plate made of ABS-plastic with integrated aluminium profiles on the underside, Post support: galvanized steel |
| Width [m]: | 1,0 |
| Height [mm]: | 78.0 (total) |
| Packaging unit: | Piece |
| Weight [kg]: | 13.0 (total) |
| Pressure [kN/m²]: | 250.0 (with 10% yield) |
| Backfill volume [l/m²]: | 16,0 |
| Compatible with bitumen: | Yes |
| Additional info: | Post support: Length approx. 1470 mm, height approx. 35 mm from top of Base plate. Fixing flange: four slotted holes for M 10 screws, spacing 100 x 75 mm. |
Construction base for penetration-free railing solutions made of profiled ABS plastic, total height approx. 78 mm, length x width approx. 200 x 100 cm, height of Base plate approx. 43 mm, with rubberised underside stiffening profiles made of aluminium and an end post support with horizontal galvanized steel fixing flange, hot-dip galvanized in accordance with DASt guideline 022, for mounting 4 M 10 screws at 100 x 75 mm intervals, height of fixing flange above top of Base plate approx. 35 mm, dimensioned in accordance with DIN EN 1991-1-1/NA for horizontal forces up to 1 kN/m with a Superimposed / extra load of at least 200 kg/m², supply and tightly
Backfilling of the base plate with gravel / grit (grain size max. 8/16 mm), requirement approximately / approx. 16 l/m², outside corners are to be calculated in the following item.
With a concrete slab, the chippings bedding above the system base must be at least 5 cm so that the fixing flange is covered with approximately / approx. 1.5 cm of stone chippings.
Product: Zinco Guardrail Base "GB"
Unit: pcs
Order Nr.: 3420
Scope of delivery

Guardrail Base GB, Order No. 3420

Guardrail Base GB-corner left, Order No. 3445

Guardrail Base GB-corner right, Order No. 3446
Guardrail Base GB-F, Order No. 3498
Installation steps Guardrail Base GB
Laying out the Guardrail Base GB and installing the railings

Measuring and laying out the Guardrail Base GB and ..

... assembly of the railings

Hole pattern of the fixing flange of the Guardrail Base GB
Measuring and laying out the Guardrail Base according to the planning documents. The specified spacing of the railing posts must be observed. If surface drainage is required and the post spacing is > 1.0 m, the gaps must be designed accordingly (e.g. ZinCo Floradrain® FD 40).
The railings are installed using a screw connection with a suitable counter flange. Lanyards (M10 screws, washers and stop nuts) should be made of Stainless steel. The washer should be placed on the rubberised underside of the slotted hole. The material temperature should be above +5° during installation. The manufacturer's installation instructions must be observed when installing the railings!
Applying the required Superimposed / extra load
The required Superimposed / extra load in the table below is for Guardrail Base GB depending on the required horizontal forces (h) and post spacing (s). If the wind load is greater than the required upright load, this must be used to determine the required Superimposed / extra load. Before applying the required Superimposed / extra load, we recommend checking all connections and the position of the railings.
Notice:
The Guardrail Base must always be filled with stone chippings or gravel / grit up to the top edge of the system base (approx. 43 mm). With a filling volume of 15-16 l/m², this corresponds to a Superimposed / extra load of approximately / approx. 25 kg/m². Superimposed / extra load can take the form of a concrete slab in a chippings bedding at least 50 mm high, with an appropriate greening structure, gravel or another equivalent bulk material.
Required Superimposed / extra load in kg/m²

The dry weight of the construction is decisive.